EMA, FDA, and PIC/S inspectors now consider Q8–Q9–Q10–Q12 essential elements of a modern quality system. During inspections, they look for evidence of scientific, risk-based, and documented decision-making. This article provides a clear overview of what inspectors evaluate and how to ensure full audit readiness.
In-depth regulatory analysis
Q8 – Pharmaceutical Development
Attention is paid to:
- Clear QTPP
- Mapping of CQAs
- Rationale of Design Space
- DOE and experimental data
- Complete control strategy
Inspectors verify consistency between development and the business process.
Q9 – Quality Risk Management
Aspects evaluated:
- Existence of a QRM SOP
- Correct use of FMEA and tools
- Proportionality of the level of formality
- Link between QRM and decisions
- Periodic risk review
Q9 is required in change control, deviations, CAPA, suppliers and validations.
Q10 – Pharmaceutical Quality System
Inspectors check:
- Process and trend monitoring
- Effectiveness of CAPA and investigations
- Change control maturity
- Management Review
- Integration of Q8 and Q9 into the PQS
A mature PQS is based on knowledge, risk and continuous improvement.
Q12 – Lifecycle Management
Typical checks:
- Definition of Established Conditions
- Presence of the PLCM Document
- Using PACMP
- Consistency between change history and change register
A weak implementation of Q12 is often a sign of a fragile PQS.
What inspectors are looking for
- Written evidence of scientific rationale
- Updated and versioned documents
- Connection between QTPP → CQA → critical parameters
- Trend analysis and early warning signals (CPV)
- Investigations with real root cause
- Decisions based on risk, not opinion
How to avoid critical deviations
Applicable strategies:
- Implement robust, non-generic FMEAs
- Validate process controls before reducing final testing
- Keep design space and control strategy aligned
- Review risk at each supplier change
- Use PAT and continuous testing to reduce variability
Audit Readiness – Essential Documents
- QTPP + CQA
- FMEA / QRM Report
- DOE + Design Space
- Control Strategy
- CAPA with effectiveness verification
- PLCM Document
- Complete change controls
- PQR with trends and recommendations
🔧 Typical Error – Recommended Corrective Action
Error: FMEA obsolete or inconsistent with the business process.
Action: Re-execute QRM by integrating CPV data, deviations, complaints, verifying real risk and updating control strategy.